Physical Infrastructure

Power

Biomass Projects in Aurangabad, Maharashtra

The primary fuel used for the said project is biomass such as cotton stock, maize bhutta, soya husk, juliflora and other agro waste. The electricity generated from this project is sold to MSEDCL as per the Power Purchase Agreement (“PPA”), which is valid for a period of 13 years (Dec 2008 till Dec 2021)
Projects in this Sector
  • 1004 MW of Wind Power Projects
  • 1090 MW Tripura Gas Based Power Project
  • 145 Km, 400KV, D/C Indo-Nepal Transmission Line
  • 6000MW Nana Layja Power Project (4000 MW Coal & 2000 MW Gas)
  • 660 km, 400 kV Transmission Line – (Associated with Tripura Power Project)
  • Bihar State Electricity Board
  • Biomass Projects
  • Biomass Projects in Aurangabad, Maharashtra
  • Indo Nepal Transmission Lines
  • Karimnagar Thermal Power Project
  • Krishnapatnam Thermal Power Project
  • Nuclear Power Corporation of India Limited
  • ONGC Tripura Power Project
  • Thermal Power Projects : 726.6 MW Tripura Gas Power Project
  • Thermal Power Projects in Tamil Nadu
  • Transmission Lines
  • Waste to Energy Projects